    Công Ty TNHH Đầu Tư Xây Dựng Hưng Nghiệp Phú (Hung Nghiep Phu Construction Investment Company Limited)

    1. General information:

    - Company name: Hung Nghiep Phu Construction Investment Company Limited.
    - English name: Hung Nghiep Phu Construction Investment Company Limited.
    - Abbreviated name: HNP COINCO.,LTD
    - Tax code: 3702 719 915
    - Head office: No. 2034D, Group 22, Phuoc Thai Quarter, Thai Hoa Ward, Tan Uyen Town, Binh Duong Province, Vietnam..
    - Account number: 050 097 814 136 - Sacombank - Dong Nai branch
    1904 2010 53632 – Agribank – Eastern branch.

    - Email: hungnghiepphu01@gmail.com, hungnghiepphu02@gmail.com
    - Website:  www.xaydunghungnghiepphu.com
    - Year of establishment: The enterprise was established under decision No. 4102036304 issued for the first time on November 13, 2018 of the Department of Planning and Investment of Binh Duong Province

    2. Charter capital: 18,000,000,000 VND.
    3. Business lines

    - Construction consulting.
    - Design consultancy.
    - Supervision consultants.
    - Purchase building materials.
    - Civil construction and industry.
    - Road construction.
    - Interior decoration.
    - Construction of civil and industrial electrical projects.
    - Cargo transportation business
    - Supervision of construction of civil and industrial projects.
    - Design and construction of civil and industrial projects.
    - Ground filling.
    - Irrigation and water supply and drainage works

     

    4. MAIN BUSINESS LINE

    4.1 Establishing construction investment projects

    a. Prepare construction investment reports (Pre-feasibility study reports) and apply for investment permits for projects.

    b. Prepare construction investment project (Feasibility study report) for group B and C projects, including the following tasks:
    + Prepare investment project explanations;
    + Basic design based on the selected design plan.

    c. Lập Báo cáo kinh tế -kỹ thuật xây dựng công trình đối với các dạng công trình:


    + Construction works for religious purposes;
    + New construction, renovation, repair, and upgrade projects with a total investment of less than 15 billion VND (excluding land use fees), in accordance with socio-economic development planning and planning industry, construction planning; except in cases where the investment decider finds it necessary and requires the establishment of a construction investment project.

    4.2 Construction survey
       Construction survey (according to Article 46 - Construction Law) includes: topographic survey; geological survey of works, hydrogeological survey, survey of current state of works and other survey work serving construction activities (survey, assessment of the impact of construction works on the environment) surrounding environment) for grade I, grade II, grade III and grade IV works of the same type. Construction surveys are only conducted according to approved survey tasks.
    4.3 Construction design
      Construction design for all types of Civil and Industrial projects from level II, level III and level IV. Depending on the nature and scale of each type of project, construction design can be prepared in one step, two steps or three.
    4.4 Verify investment estimates, design estimates and synthesize construction estimates.

    a. Verification of construction investment projects includes:
    + Consider factors that ensure the effectiveness of the project, including: the need for investment; project input factors; scale, capacity, technology, time and progress of project implementation; Financial analysis, total investment, socio-economic efficiency of the project.
    + Consider factors ensuring project feasibility, including: compatibility with planning; land and resource use needs (if any); ability to clear land, ability to mobilize capital to meet project progress; management experience of the investor; ability to repay loans; fire prevention and fighting solutions; factors affecting the project such as national defense, security, environment and other relevant legal regulations.
    b. Construction design verification includes the following tasks:
    + Check compliance with approved design steps;
    + Compliance with applicable construction standards;
    + Evaluate the level of project safety, the reasonableness of the choice of technology line and selected equipment (if any); correct application of Economic - Technical norms;
    + Cost norms, unit prices, relevant policies and cost items in the estimate according to regulations, etc. Consulting on bidding and contractor selection in construction activities

    4.5 Consulting on bidding and contractor selection in construction activities.

    a. Prepare bidding documents based on:
    + The bidding plan has been approved by the competent authority
    + Investor's requirements
    + Design documents (including: Technical explanation + Drawings + Detailed estimates) have been approved and relevant legal documents.
    + Construction conditions.
    b. Analysis and evaluation of bid documents (after approval of bidding documents) includes the following tasks:
    + Bid opening;
    + Organize bid evaluation;
    + Bid evaluation report.

    4.6 Construction supervision

     On behalf of the Investor, manage all or each item of the project, monitor quality, construction progress, supervise contract implementation, etc. during the construction process.

    4.7 Evaluation of construction equipment assets

     Based on the current pricing policy, evaluate the project or each part of the project, help the Investor make settlement payments in construction or determine the price of investment capital contributions, joint ventures, etc.

    4.8 Evaluate and determine the cause of construction incidents

     Analyze and evaluate the causes of construction incidents to establish remedial measures, renovate and upgrade the construction.

    4.9 Project interior design

     Interior design includes work on organizing the architectural space inside the building, organizing the arrangement of objects and small objects that create the architectural space in the house (floor, walls, ceiling, etc. ). Use the language of color, light and sound to organize and decorate to create aesthetic connections, etc. Exterior design includes work on organizing the architectural space outside the building. Use blocks, colors, yards, roads, flower gardens, ornamental plants, etc. to create a building landscape.

     


    ----------
    Production and business results of the Company

    (Summary table of financial data for the last 3 fiscal years (2022-2023)

     

    TT/No

    Economic information

    Year 2022 (VND)

     Year 2023 (VND)

    (Until November 2023)

    Note

    1

    Total assets

    50.000.000.000

    90.000.000.000

     

    2

    Total liabilities

    9.000.000.000

    15.500.000.000

     

    3

    Total short-term assets

    15.000.000.000

    25.000.000.000

     

    4

    Short-term debt

    5.5000.000.000

    8.800.000.000

     

    5

    Revenue

    80.000.000.000

    240.000.000.000

     

    6

    Profit before tax

    12.000.000.000

    19.500.000.000

     

    7

    Profit after tax

    5.700.000.000