COMPONENT DRAWINGS OF THE LATEST DETAILED URBAN PLANNING PROJECT

News
Date Submitted: 15/07/2024 09:25 AM

COMPONENT DRAWINGS OF THE LATEST DETAILED URBAN PLANNING PROJECT

 

Planning dossier drawings record documents containing information related to urban planning. So what should be included in a detailed urban planning drawing? Take a look at the article below with Hung Nghiep Phu for more details!

    1. Drawing components of detailed urban planning project documents

    Detailed urban planning project documents are understood as all documents containing information about planning tasks, in addition, this project document also states the requirements that need to be met during the planning process. specifically. As noted, the drawing component of the detailed urban planning project file includes the contents specified in Clause 1, Article 12 of Circular 04/2022/TT-BXD as follows:

    – Location map and land boundaries are one of the important components and must be mentioned first:

    • Location map and land boundaries are the location and boundary scope that an individual plans in the general plan and urban zoning plan approved by the competent authority;  This diagram also needs to clearly show the relationship between the planning area and other streets and functional areas in the urban zoning plan (if any);
    • In the pre-approved general urban planning, the detailed urban location map needs to be shown in a certain drawing at an appropriate scale on the basis of the urban spatial development orientation map of the plan. general plan.

    – Drawings shown on a 1/500 scale topographic map need to clearly show the current land use status and information shown on the map; In addition, architecture, landscape and construction land assessment: The current status of land use functions is guided according to the provisions in Appendix VI of this Circular;  The content shows landscape architecture, social infrastructure systems (education, healthcare, culture, commerce, trees, housing, ...);

    – Drawings are developed so it is necessary to have a map of the current status of the technical infrastructure system and environmental protection: Factors related to Traffic, energy supply and urban lighting, communications , water supply, ground level and rainwater drainage, wastewater drainage are some of the factors that cannot be ignored; At the same time, processes for managing solid waste, cemeteries and the environment must also be recorded in this drawing;

    >>> See more: Quy hoạch chi tiết tỷ lệ 1/500 là gì? Những dự án nào cần sử dụng bản đồ quy hoạch tỷ lệ 1/500

    – Regarding maps of the current status of technical infrastructure systems and environmental protection, it is necessary to contain information about traffic, energy supply capacity and urban lighting, and related issues. communication, water supply, ground level and rainwater drainage, wastewater drainage are mentioned; In addition, solid waste management, cemeteries, and the environment;

    – Planning project drawings need to have maps of total land use planning, specifically: Verify full information on area size, population and planned land use norms for each project. each plot of land (formed by internal level lines) in the planning area. These issues are implemented according to the provisions in Appendix VI of this Circular; The individual making this map also needs to create construction setbacks for roads from the internal level; location and scale of underground works. For areas used for housing groups, social housing construction areas (if any) also need to be clearly confirmed; In addition, the locations and sizes of social infrastructure systems at urban level and above and at housing unit level (if any) in the area. The drawing is shown on a 1/500 scale topographic map;

    – At the same time, prepare additional spatial, architectural and landscape organization diagrams: Shown on a 1/500 scale topographic map;

    – Traffic system planning map, red line boundaries, construction boundaries; In addition, the location, size of terminals, parking lots (overhead, above ground and underground) and protection corridors of technical infrastructure lines up to internal road level. The drawing is shown on the basis of an organization chart of landscape architectural space combined with a 1/500 scale topographic map;

    – Technical infrastructure system planning maps for each specialty: Technical preparation, energy supply and lighting, wastewater drainage, solid waste management, passive telecommunications infrastructure and public works. other technical infrastructure. The drawing is shown on the basis of an organization chart of landscape architectural space combined with a 1/500 scale topographic map;

    – General map of technical lines and pipelines. The drawing is shown on the basis of an organization chart of landscape architectural space combined with a 1/500 scale topographic map;

    – Drawings identifying underground construction areas: Underground public works, high-rise buildings with basements (if any), etc. Drawings are shown at appropriate scale on the diagram. organize landscape architectural space combined with topographic maps;

    – Urban design drawings: Follow the regulations in Circular No. 06/2013/TT-BXD.

    >>> See more: 

     

    2. How much do you need to pay to hire a foreign consultant to prepare detailed urban planning?

    To prepare detailed urban planning, individuals and organizations need to have certain expertise. In cases where it is not possible to independently develop detailed planning project drawings, individuals and organizations can hire foreign consultants to prepare detailed urban planning. According to the provisions of Article 8 of Circular 20/2019/TT-BXD stipulates as follows:

    – The costs of hiring foreign consulting organizations and individuals to prepare planning are determined by estimates but must not exceed the following costs:

    + When hiring a domestic consulting organization, this organization presides over and coordinates with foreign consultants to establish tasks and create planning projects: Currently, the cost of hiring a domestic consulting organization is and the cost of hiring foreign consultants must not exceed 1.5 times the cost of setting up tasks and planning projects calculated according to this Circular;

    + If you need support from a domestic consulting organization or a foreign consulting organization, these two organizations will coordinate with each other to set up tasks and create planning projects: According to records, the cost of hiring domestic consulting organizations and foreign consulting organizations is determined not to exceed 2.5 times the cost of setting up tasks and planning projects calculated according to this Circular;

    – In case of hiring a foreign consulting organization to perform all tasks and planning projects: The cost of hiring a foreign consulting organization must not exceed 3.5 times the cost of setting up the appointment. services, prepare planning projects according to this Circular;

    – In some cases, drawings and documents have complex and special nature and requirements, and planning projects are determined by making estimates according to the instructions of this Circular, but the cost of hiring a team is determined. If a foreign consulting organization exceeds the limits specified in Clause 1 of this Article, when hiring a foreign consulting organization to set up tasks or prepare planning projects, the planning cost estimate must be approved by a competent authority. Report to the planning project approval level and decide to approve the estimate according to regulations.

     

    3. Which agency is approved for detailed urban planning cost estimates?

     
     

    Pursuant to Article 10 of Circular 20/2019/TT-BXD, the authority to appraise and approve planning cost estimates is carried out according to the following instructions:

    – Responsibility for planning planning tasks or preparing  planning projects and costs for carrying out tasks related to planning are carried out by the level approving the planning project or the authorized level. organize appraisal and approval of cost estimates;

     – Currently, the agency with the authority to organize appraisal and approval of cost estimates for planning tasks, planning projects and costs for performing tasks related to planning is the Ministry of Construction. , Ministries and People's Committees of provinces and centrally run cities; To be approved, issues related to planning projects and costs for performing work must fall under the authority of the Prime Minister for approval.

     

    Legal documents used in the article:

    – Circular No. 20/2019/TT-BXD of the Ministry of Construction: Instructions for determining and managing construction and urban planning costs;

    – Circular 04/2022/TT-BXD Documents of tasks and documents of inter-district, district, urban and rural construction planning projects.

     

     

    Above is all the legal content related to "drawing components of the latest detailed urban planning project documents" that we have compiled via the Internet. Hopefully through this article, Hung Nghiep Phu has brought you useful information. Hung Nghiep Phu Construction Investment Company Limited specializes in complete construction of civil and industrial construction projects. Please contact Hung Nghiep Phu Construction Investment Co., Ltd. for advice today!

    >>> See more:

    ------------------------------

    CONTACT INFO:

    Facebook: Công ty TNHH Đầu tư Xây dựng Hưng Nghiệp Phú (興業富)

    Đường dây nóng: 1800.3368 (Miễn phí)

    Trang web: xaydunghunnghiepphu.com

    Gmail: kinhdoanh01@xaydunghunnghiepphu.com

    Address: No. 2034D, Group 22, Phuoc Thai Quarter, Thai Hoa Ward, Tan Uyen Town, Binh Duong Province

    -------
    Source: collected on the Internet