WHAT IS 1/500 SCALE DETAILED PLANNING? WHICH PROJECTS NEED TO USE 1/500 SCALE PLANNING MAP?

News
Date Submitted: 11/07/2024 03:37 PM

WHAT IS 1/500 SCALE DETAILED PLANNING? WHICH PROJECTS NEED TO USE 1/500 SCALE PLANNING MAP?

 

1/500 map is a type of map that appears in planning projects, however, not everyone knows the project that needs to be used and the true meaning of this type of map. Join Hung Nghiep Phu to learn more about 1/500 scale planning through the article below!

    1. What is a 1/500 detailed planning map?

    Pursuant to Clause 2, Article 30, Urban Planning Law 2009: "Drawings of detailed planning projects are shown at a scale of 1/500".

    The 1/500 detailed planning map is the total planning area of ​​construction investment projects, the basis for project positioning, basic design, construction technical design and construction. carry out construction.

    – 1/500 planning must be associated with a specific project.

    – 1/500 planning is the basis for obtaining a construction permit (later for the project) and establishing a construction investment project.

    Map scale 1/500 is the ratio between the length of a line segment on the map compared to the length of that same line segment on the ground.

    Notation: 1/500 or 1:500

    Therefore, the drawing of the detailed planning project specifically arranges all works on the land. Regarding technical infrastructure, detailed planning is arranged to each plot boundary.

    2. Meaning of 1/500 planning map

    The 1/500 scale planning specifies the content of zoning and general planning. This type of planning map helps people easily see the specific layout details of all works on project land. Regarding technical infrastructure, the map will show details down to each plot boundary.

    On the other hand, detailed planning of 1/500 is the total area planning of construction projects, which is the basis for locating works, basic design, technical design of construction and implementation of construction. build.

    3. Which projects need 1/500 planning?

    • For concentrated construction projects

    Concentrated construction works include functional areas inside and outside urban areas such as: Urban areas, residential areas, tourist areas, heritage conservation areas, industrial clusters, commercial and educational tourism areas. training, medical...

    Before setting up a construction investment project, the investor must prepare a 1/500 detailed planning on the basis of the approved 1/2000 detailed planning.

    In case the project has a scale of less than 5 hectares, detailed planning of 1/500 is not required. But it must be ensured that the general site drawings, construction architectural plans, and technical infrastructure solutions in the basic design content must be consistent with the approved 1/2000 detailed construction planning.

    For projects over 5 hectares (over 2 hectares for apartments), detailed planning of 1/500 must be conducted on the basis of the approved detailed planning of 1/2000.

    • For single projects

    Individual projects do not need to prepare and submit for approval a 1/500 detailed plan, but must ensure that the general site drawings, construction architectural plans, and technical infrastructure solutions in the basic design content must be in accordance with the approved detailed construction planning 1/2000. Ensure technical infrastructure connection and architectural space compatibility with the surrounding area.

    On the contrary, for construction projects with a scale of over 5 hectares or apartment buildings with an area of ​​over 2 hectares, you need to conduct construction planning at a scale of 1/500 on the basis of detailed planning of 1/2000. has been approved.

    4. Authority to approve 1/500 planning

    According to Article 31 of Decree 37/2010 ND-CP, the following agencies have the authority to approve 1/500 planning:

    – Ministry of Construction: approves planning projects at a scale of 1/500 for projects under the licensing authority of the Prime Minister.

    Provincial People's Committee: approves 1/500 planning projects for projects under the licensing authority of the Provincial People's Committee.

    District-level People's Committee: approves planning projects at a scale of 1/500 under the licensing authority of the district-level People's Committee, projects under subdivision planning, detailed construction planning, and rural construction planning.

    Note: the above regulations on approval authority are of a general nature in state administrative management. There are some provincial People's Committees that authorize opinions or approvals or specialized agencies, such as: authority for the architectural planning department.

    In all cases of approving a 1/500 detailed planning project under the authority of the district-level People's Committee, it is necessary to have the unanimous opinion of the architectural planning department or the provincial-level People's Committee before the district-level People's Committee approves it. Browser.

    Therefore, when projects are built according to this decision, they will ensure legality and high transparency.

    5. Procedure for making detailed planning 1/500

    In fact, planning must comply with the National Assembly's socio-economic development planning for each specific region. If approved by the National Assembly, it will be deployed to each district. The steps are as follows:

    • First: The National Assembly plans economic development orientations for regions.
    • Next, the prime minister submits it to the National Assembly for approval.
    • After the planning project is approved, the Provincial People's Committee is responsible for creating a 1/5000 scale planning map and submitting it to the government for approval.
    • The National Assembly approved the detailed planning of 1/5000 and then went to the district to do the task of zoning planning. Planning map at 1/2000 scale.
    • Once the province approves the 1/2000 plan, the investor will prepare a detailed plan at the 1/500 scale and send it to the district for approval.

    Thus, if you want to have full authority to approve planning projects, you need to follow the 1/500 detailed planning process, detailed regulations on contractor selection plans, and required documents. other relevant legislation. After completing the paperwork, the announcement of the 1/500 detailed project planning is only a matter of time.

    Above is all the legal content related to the 1/500 detailed planning that we have collected. Hopefully Hung Nghiep Phu has brought you useful information through this article. Hung Nghiep Phu Construction Investment Co., Ltd. specializes in complete construction of civil and industrial construction projects. Please contact Hung Nghiep Phu Construction Investment Co., Ltd. for advice today!

    >>> See more:

    ------------------------------

    CONTACT INFO:

    Facebook: Công ty TNHH Đầu tư Xây dựng Hưng Nghiệp Phú (興業富)

    Đường dây nóng: 1800.3368 (Miễn phí)

    Trang web: xaydunghunnghiepphu.com

    Gmail: kinhdoanh01@xaydunghunnghiepphu.com

    Address: No. 2034D, Group 22, Phuoc Thai Quarter, Thai Hoa Ward, Tan Uyen Town, Binh Duong Province

    -------

    Source: collected on the Internet