COMMON PROBLEMS WHEN APPLYING FOR A CONSTRUCTION PERMIT

News
Date Submitted: 16/07/2024 04:04 PM

COMMON PROBLEMS WHEN APPLYING FOR A CONSTRUCTION PERMIT


Before starting to build a project, obtaining a construction permit is an important and mandatory step. Someone once said "a construction permit application is a difficult journey". So what about the process of applying for a construction permit? Is the construction complicated or simple? Join Hung Nghiep Phu in reading this article to learn about common problems encountered when applying for a construction permit during the procedure to avoid this problem!

    1. What is a construction permit?

    Construction permit is a legal document issued by a competent state agency to investors for new construction, repair, renovation, and relocation of works. The content of the construction permit includes: Project name, name and address of the investor, location, construction location, red line boundaries, construction boundaries, construction start date.

    Construction permits include the types of permits specified in Clause 3, Article 89 of the 2014 Construction Law, specifically as follows:

    • New construction permit;
    • License for repair and renovation;
    • Construction relocation permit.

    >>> See more:

    2. Common problems when applying for a construction permit

    During the process of applying for a construction permit, there are some common problems that you often encounter such as submitting documents to the wrong authority, submitting missing or incorrect components in the construction documents. This leads to a long time to apply for a construction permit and costs. Below are some problems that Lathaco customers often encounter.

    nhung-van-de-thuong-gap-khi-xin-giay-phep-xay-dung-1

    (Illustration, source: Internet)

    2.1. Profile element “dancing”

    The application for a construction permit includes many different types of documents. Including a construction permit application form, a notarized copy of the land use right certificate bearing the investor's name and a construction permit drawing.

    However, during the process of applying for a construction permit, many unforeseeable points may arise. Some common problems homeowners encounter include:

    • Being exposed;
    • Wrong landmark;
    • The area has been changed, the current state of the house is not according to the pink book and red book;
    • Current status drawings are wrong;
    • The permit drawing shows the location of the project, the floor plan, cross-section, and facade of the project are not correct;
    • Detailed foundation drawings must not ignore errors and must strictly comply with the prescribed ratios, so most investors cannot do it themselves.…

    And there are many other reasons. Leading to a very long process of editing and completing documents and traveling many times, the homeowner will be very tired...

    >>> See more:

    2.2. Submitting documents to the wrong competent authority
    Depending on the scale, nature, type of project and construction location, your application for construction permit is done at different agencies. If you do not consider carefully before implementing, you may waste time and have your documents confused by not submitting to the correct licensing authority.

    2.3. Documents returned due to invalid or insufficient documents
    Basically, the application for a construction permit in each locality will be the same but will be different in details. No two localities are the same in terms of regulations for applying for construction permits, so there will be many difficulties with the design leading to many revisions and trips. For example, the paper size for presenting design drawings in Di An is A1, A2, Thuan An A3 and in Thu Dau Mot, Ben Cat, Tan Uyen it is A4.

    2.4. The application was returned due to planning problems

    
bi-tra-ho-so-vi-ly-do-vuong-quy-hoach

    (Illustration, source: Internet)

    Before buying land, you do not check real estate information first to see if this area will be planned in the future or not.  When I wanted to build a house, I submitted an application for a construction permit, and waited for the results to be returned, when I received a written response "not allowed to build due to lack of qualifications".

    Through the above article, we hope that the information provided by Lathaco will help you in the process of applying for a house construction permit. If you have any questions, please contact Lathaco immediately for the fastest support.

    >>> You might like:

    2.5. The actual time to apply for a construction permit is often prolonged
    According to regulations, the licensing time for individual housing construction in urban areas is 15 days or less and for housing in rural areas is 10 days or less (excluding Saturdays, Sundays, and holidays). However, there are many cases where the construction permit issuance time is often delayed due to problems in verification, verification or because the construction permit drawings are not accurate.

    Therefore, the application often has to be adjusted many times, and when the application is submitted, the time has to be calculated from the beginning. This causes a lot of trouble, affects the investor's plans, and sometimes even causes heavy economic losses.

    Note: This is only the time to apply for a permit, we do not include the time to prepare previous documents, especially the time to find a unit to draw design drawings in accordance with the provisions of construction law.

    thoi-gian-xin-cap-phep-xay-dung-bi-keo-dai

    (Illustration, source: Internet)

    2.6. Construction drawings will vary in each locality
    Basically, the procedures between localities will be the same but will differ in details. No two localities are the same in terms of regulations for applying for construction permits, so there will be many difficulties with the design leading to many revisions and trips. For example, the paper size for presenting design drawings in Di An is A1, A2, Thuan An A3 and in Thu Dau Mot, Ben Cat, Tan Uyen it is A4.

    2.7. Costs incurred when applying for a construction permit
    This is an administrative procedure, so those who want to apply for a license must also pay some fees according to the law. According to current legal regulations, when applying for a license, you will have to pay a number of fees such as:

    • Cost of placing construction markers;
    • The cost for a full set of design drawings in accordance with the provisions of the Construction Law ranges from 3 million to 10 million or more, depending on the scale and area;
    • Fees for applying for a license to build individual houses.

    3. Construction permit application service at Hung Nghiep Phu
    If you are having difficulty applying for a construction permit, then use the construction permit application service at Hung Nghiep Phu Construction Investment Co., Ltd. - both reputable and professional. With a team of experienced staff who understand the permit application process, we will help you resolve all questions and obtain a construction permit as quickly as possible.

    Reasons why customers should confidently choose the license application service at Hung Nghiep Phu:

    • Professional staff, knowledgeable about construction law: The staff at Hung Nghiep Phu not only has extensive professional knowledge but also has a clear understanding of regulations and laws in the field of construction and related laws. mandarin.
    • Fast construction permit processing time: We will help you process the construction permit application process as quickly as possible, helping your project be implemented promptly as expected.
    • Experienced design team: With many years of experience in the field of design and construction, Hung Nghiep Phu's design team is always well-versed in design standards. From there, we bring customers the most creative and suitable design solutions for your project.

     

    Hopefully with the above article, customers will have the necessary information to support their construction permit application process. Hung Nghiep Phu Construction Investment Company Limited - specializes in complete construction of Civil and Industrial projects. We hope to be able to accompany customers in construction projects as well as legal procedures such as preparing planning documents, applying for construction permits, applying for fire protection certificates, etc. If there is any If you have any questions or are in need of designing and building complete projects, please contact us immediately for a free consultation!

    ------------------------------

    CONTACT INFO:

    Facebook: Công ty TNHH Đầu tư Xây dựng Hưng Nghiệp Phú (興業富)

    Hotline: 1800.3368 (Miễn phí)

    Trang web: xaydunghunnghiepphu.com

    Gmail: kinhdoanh01@xaydunghunnghiepphu.com

    Address: No. 2034D, Group 22, Phuoc Thai Quarter, Thai Hoa Ward, Tan Uyen Town, Binh Duong Province

    -------

    Source: collected on the Internet



    Other News articles

    Partner

    © 2022 Sneaker Shoes en, All rights reserved. Web design by HD Agency